Resource Type

Journal Article 1082

Year

2024 2

2023 62

2022 85

2021 63

2020 56

2019 63

2018 49

2017 67

2016 50

2015 58

2014 55

2013 53

2012 48

2011 53

2010 59

2009 45

2008 41

2007 33

2006 17

2005 17

open ︾

Keywords

management 49

engineering management 39

construction 28

project management 23

sustainable development 20

ecological civilization 18

construction management 15

innovation 13

China 12

construction technology 10

Three Gorges Project 9

engineering 9

risk management 9

management system 8

construction industry 7

BIM 6

suspension bridge 6

thermal management 6

blockchain 5

open ︾

Search scope:

排序: Display mode:

The South-to-North Water Diversion Project

Office of the South-to-North Water Diversion Project Construction Committee, State Council, PRC

Engineering 2016, Volume 2, Issue 3,   Pages 265-267 doi: 10.1016/J.ENG.2016.03.022

A DSS for Management on the Jointly Discharging of Overtopped Cofferdam

Fang Debin,Wang Xianjia,Hu Zhigen

Strategic Study of CAE 2003, Volume 5, Issue 1,   Pages 62-68

Abstract:

Management on the jointly discharging of overtopped cofferdam is a typical semi-structured problemSo a decision support system is designed to address the management on the jointly discharging of overtoppedsystem,which integrates computer science and technology with the theory and method of systems science, management

Keywords: overtopped cofferdam     construction diversion management     decision support system (DSS)    

Multi-objective Risk Model of Optimal River Diversion Standards During Initial Stage Construction for

Hu Zhigen,Liu Quan,He Changhal,Xiao Huanxiong,Zhou Yihong,Fu Zheng,Li Dingkui

Strategic Study of CAE 2001, Volume 3, Issue 8,   Pages 58-63

Abstract:

For a hydropower project, river diversion planning directly decides the dam construction and has abearing on the diversion standard.The relations between selection of diversion standard and investment, construction duration, risk andits losses of diversion structures should be coordinated.construction.

Keywords: construction diversion     initial stage of construction diversion     standard of construction diversion     multi-objective    

Whole construction process real-time schedule control and visual analysis of the long distance diversion

Hu Lianxing,Tong Dawei,Jiao Kai

Strategic Study of CAE 2011, Volume 13, Issue 12,   Pages 97-102

Abstract:

Long diversion tunnel is often featured by great embedded depth, long, leading to the deviation between formerly construction schedule plan and actual construction scheduleIf the deviation isn't corrected timely, the formerly plan can not guide the actual construction.process real-time schedule control and visual analysis of the long distance diversion tunnel based onThe feasibility study and scientific basis is provided for the real-time control of construction schedule

Keywords: long diversion tunnel     construction schedule     real-time control     visual     simulation    

A study of the management model of ecological diversion water in the Dongchang Lake watershed

Chen Youyuan,Cui Xiang,Yang Shiying,Zhang Wei,Li Yaping,Hu Guangxin

Strategic Study of CAE 2010, Volume 12, Issue 6,   Pages 65-70

Abstract: present the international research emphasis of lake water environment has turned to study ecosystem managementThis paper put forward the management concept framework of ecological diversion water based on the definitionof ecological diversion water in the Dongchang Lake watershed.It includes ideas and concepts of watershed management, water environmental management and ecologicalsystem management.

Keywords: Dongchang Lake     lake watershed     management model of ecological diversion water    

The construction design and practice of Three Gorges Project

Wen Yonghong,Xie Xiangrong,Fan Wuyi

Strategic Study of CAE 2011, Volume 13, Issue 7,   Pages 111-116

Abstract:

The construction of Three Gorges Project (TGP) is characterized by largeconstruction scale, high construction intensity and complexity in technology.is as follows:construction in 3-stage,navigation with diversion channel and power generation under cofferdamproject.The practice and innovation achievements in river diversion during construction as well as earthrock and concrete construction were presented emphatically.

Keywords: Three Gorges Project     construction     diversion     earth rock     concrete    

Insurance ratemaking method for risk of construction diversion project

Chen Zhiding,Hu Zhigen

Strategic Study of CAE 2011, Volume 13, Issue 4,   Pages 106-112

Abstract:

Based on analyzing risk factors of diversion project, synthetic riskand distribution law of loss were researched on the grounds that foundation pit is submerged after diversioncollective risk model of the total losses about engineering insurance is established on the basis of constructiondiversion project risk.Ultimately, insurance ratemaking method for construction engineering risk and its mathematical expression

Keywords: diversion risk     engineering insurance     insurance premium     non-homogeneous compound Poisson process    

Situational Awareness in Construction and Facility Management

Burcu Akinci

Frontiers of Engineering Management 2014, Volume 1, Issue 3,   Pages 283-289 doi: 10.15302/J-FEM-2014037

Abstract: Engineers and managers involved in construction and facility/infrastructure operations need situational

Keywords: building information models (BIM)     sensors     facility operations and management     construction management    

Web-based construction equipment fleet management system: cost-effective global and local allocation

Hakob AVETISYAN, Miroslaw SKIBNIEWSKI

Frontiers of Engineering Management 2017, Volume 4, Issue 1,   Pages 76-83 doi: 10.15302/J-FEM-2017012

Abstract: Over the last two decades, construction contractors have been gradually making more investments in constructionequipment to meet their needs associated with increasing volumes of construction projects.The proposed model incorporates logical strategies of supply chain management to optimally select constructionThe model benefits those responsible for informed decision-making for construction equipment selectionIt also benefits the owners of construction companies, owing to its cost-minimization objective.

Keywords: Construction equipment     Equipment assignment optimization     Web-based asset management    

Value Management Practices on Major Construction Projects and Green Building

Ru-jiang Zhao,Wung Hee Moh

Frontiers of Engineering Management 2016, Volume 3, Issue 2,   Pages 147-157 doi: 10.15302/J-FEM-2016018

Abstract: The paper starts with background information on value management (VM) in the construction industry andThe paper also reports case studies on the practices adopted in the planning and design management phaseof SIPO Guangdong Patent Examination Cooperation Center and in the construction management phase ofAs revealed by the practices, the value-adds and savings in construction costs through the applicationAnd the paper presents, findings on how VM can improve construction management and coordination of several

Keywords: value management (VM)     VM theory and practices     Chinese construction industry     green buildings    

Project management maturity in construction consulting services: Case of Expo in China

Yongkui LI, Qing YANG, Yan ZHANG

Frontiers of Engineering Management 2020, Volume 7, Issue 3,   Pages 384-395 doi: 10.1007/s42524-019-0070-z

Abstract: For many years, project management maturity models (PMMM) derived from the software industry have broughtHowever, the adoption and investigation of PMMM in the construction field have been weak and insufficient, particularly in construction consulting services (CCS).This study describes the construction of PMMM for CCS that considers non-process factors and combinesTo verify the effectiveness of the proposed model, we conduct a case study on the overall project management

Keywords: construction consulting services     project management maturity model     non-process factors     Expo    

Construction management and technology innovation for main projects of Quanzhou Bay Bridge

Jun DU, Fangwen WENG

Frontiers of Engineering Management 2021, Volume 8, Issue 1,   Pages 151-155 doi: 10.1007/s42524-020-0147-8

Abstract: Hongtao ZHOU, Hongwei WANG, Wei ZENG. [J]. Front. Eng, 2018, 5(1): 78-87.SangHyun LEE. [J]. Front. Eng, 2017, 4(1): 35-40.Bao-long Yuan,Sheng-gang Ren,Xing Hu,Xuan-yu Yang. [J]. Front. Eng, 2016, 3(1): 24-29.Ting Gong,Jian Yang,Hao Hu,Feng Xu. [J]. Front. Eng, 2015, 2(2): 122-124.Hong-yong Liu,Yi-qi Chen,Yi Yang. [J]. Front. Eng, 2015, 2(1): 71-75.Burcu Akinci. [J]. Front. Eng, 2014, 1(3): 283-289.Mao-run Feng,Zheng-song Zhao. [J]. Front. Eng, 2014, 1(1): 42-51.

Keywords: construction management     technology innovation     UHPC trestle panel    

System dynamics analytical modeling approach for construction project management research: A critical

Xiaoxiao XU, Patrick X. W. ZOU

Frontiers of Engineering Management 2021, Volume 8, Issue 1,   Pages 17-31 doi: 10.1007/s42524-019-0091-7

Abstract: Building and infrastructure construction projects can be viewed as a complex system consisting of manyproject management issues.project management.; (2) design error, rework, and change management; (3) risk management; (4) resource management; (5)management and the state-of-the-art of SD research.

Keywords: system dynamics     construction management     problem and recommendation     research directions     literature review    

Dynamic Coordinated Management Model of Programme in Large-Scale Construction Company

Feng Guo,Yi-qi Chen,Yi-qing Cai

Frontiers of Engineering Management 2015, Volume 2, Issue 3,   Pages 287-292 doi: 10.15302/J-FEM-2015041

Abstract: Large-scale construction companies develop rapidly when facing more and more opportunities and challengesHowever, project management technology, not meeting the requirements of firm growth, still stands proud, while relevant programme management methods have not been well studied.Therefore, this paper commences innovative application of coordinated management theory to programmemanagement according to the need of changing the existing management mode in large-scale construction

Keywords: large-scale construction company     programme     dynamic coordinated management     model    

Research and Practice of Meta-synthesis Management for the Government-led Urban Complex Construction

Ru-gui Chen,Jia-meng Chen

Frontiers of Engineering Management 2014, Volume 1, Issue 1,   Pages 52-61 doi: 10.15302/J-FEM-2014008

Abstract: This paper researches the overall construction target of government-led urban complex construction projectsperspective of sustainable urban development.In order to achieve benefit maximization, the meta-synthesis managementfor the government-led urban complex construction project is studied.In order to combine theory andpractice, several typical government-led urban complex construction project cases, such as GuangzhouThese examples point to thefeasibility of government-led meta-synthesis management and demonstrate the

Keywords: government-led construction project     urban complex     meta-synthesis management     sustainable development     benefit    

Title Author Date Type Operation

The South-to-North Water Diversion Project

Office of the South-to-North Water Diversion Project Construction Committee, State Council, PRC

Journal Article

A DSS for Management on the Jointly Discharging of Overtopped Cofferdam

Fang Debin,Wang Xianjia,Hu Zhigen

Journal Article

Multi-objective Risk Model of Optimal River Diversion Standards During Initial Stage Construction for

Hu Zhigen,Liu Quan,He Changhal,Xiao Huanxiong,Zhou Yihong,Fu Zheng,Li Dingkui

Journal Article

Whole construction process real-time schedule control and visual analysis of the long distance diversion

Hu Lianxing,Tong Dawei,Jiao Kai

Journal Article

A study of the management model of ecological diversion water in the Dongchang Lake watershed

Chen Youyuan,Cui Xiang,Yang Shiying,Zhang Wei,Li Yaping,Hu Guangxin

Journal Article

The construction design and practice of Three Gorges Project

Wen Yonghong,Xie Xiangrong,Fan Wuyi

Journal Article

Insurance ratemaking method for risk of construction diversion project

Chen Zhiding,Hu Zhigen

Journal Article

Situational Awareness in Construction and Facility Management

Burcu Akinci

Journal Article

Web-based construction equipment fleet management system: cost-effective global and local allocation

Hakob AVETISYAN, Miroslaw SKIBNIEWSKI

Journal Article

Value Management Practices on Major Construction Projects and Green Building

Ru-jiang Zhao,Wung Hee Moh

Journal Article

Project management maturity in construction consulting services: Case of Expo in China

Yongkui LI, Qing YANG, Yan ZHANG

Journal Article

Construction management and technology innovation for main projects of Quanzhou Bay Bridge

Jun DU, Fangwen WENG

Journal Article

System dynamics analytical modeling approach for construction project management research: A critical

Xiaoxiao XU, Patrick X. W. ZOU

Journal Article

Dynamic Coordinated Management Model of Programme in Large-Scale Construction Company

Feng Guo,Yi-qi Chen,Yi-qing Cai

Journal Article

Research and Practice of Meta-synthesis Management for the Government-led Urban Complex Construction

Ru-gui Chen,Jia-meng Chen

Journal Article