The South-to-North Water Diversion Project
Office of the South-to-North Water Diversion Project Construction Committee, State Council, PRC
Engineering 2016, Volume 2, Issue 3, Pages 265-267 doi: 10.1016/J.ENG.2016.03.022
A DSS for Management on the Jointly Discharging of Overtopped Cofferdam
Fang Debin,Wang Xianjia,Hu Zhigen
Strategic Study of CAE 2003, Volume 5, Issue 1, Pages 62-68
Management on the jointly discharging of overtopped cofferdam is a typical semi-structured problemSo a decision support system is designed to address the management on the jointly discharging of overtoppedsystem,which integrates computer science and technology with the theory and method of systems science, management
Keywords: overtopped cofferdam construction diversion management decision support system (DSS)
Hu Zhigen,Liu Quan,He Changhal,Xiao Huanxiong,Zhou Yihong,Fu Zheng,Li Dingkui
Strategic Study of CAE 2001, Volume 3, Issue 8, Pages 58-63
For a hydropower project, river diversion planning directly decides the dam construction and has abearing on the diversion standard.The relations between selection of diversion standard and investment, construction duration, risk andits losses of diversion structures should be coordinated.construction.
Keywords: construction diversion initial stage of construction diversion standard of construction diversion multi-objective
Hu Lianxing,Tong Dawei,Jiao Kai
Strategic Study of CAE 2011, Volume 13, Issue 12, Pages 97-102
Long diversion tunnel is often featured by great embedded depth, long, leading to the deviation between formerly construction schedule plan and actual construction scheduleIf the deviation isn't corrected timely, the formerly plan can not guide the actual construction.process real-time schedule control and visual analysis of the long distance diversion tunnel based onThe feasibility study and scientific basis is provided for the real-time control of construction schedule
Keywords: long diversion tunnel construction schedule real-time control visual simulation
A study of the management model of ecological diversion water in the Dongchang Lake watershed
Chen Youyuan,Cui Xiang,Yang Shiying,Zhang Wei,Li Yaping,Hu Guangxin
Strategic Study of CAE 2010, Volume 12, Issue 6, Pages 65-70
Keywords: Dongchang Lake lake watershed management model of ecological diversion water
The construction design and practice of Three Gorges Project
Wen Yonghong,Xie Xiangrong,Fan Wuyi
Strategic Study of CAE 2011, Volume 13, Issue 7, Pages 111-116
The construction of Three Gorges Project (TGP) is characterized by largeconstruction scale, high construction intensity and complexity in technology.is as follows:construction in 3-stage,navigation with diversion channel and power generation under cofferdamproject.The practice and innovation achievements in river diversion during construction as well as earthrock and concrete construction were presented emphatically.
Keywords: Three Gorges Project construction diversion earth rock concrete
Insurance ratemaking method for risk of construction diversion project
Chen Zhiding,Hu Zhigen
Strategic Study of CAE 2011, Volume 13, Issue 4, Pages 106-112
Based on analyzing risk factors of diversion project, synthetic riskand distribution law of loss were researched on the grounds that foundation pit is submerged after diversioncollective risk model of the total losses about engineering insurance is established on the basis of constructiondiversion project risk.Ultimately, insurance ratemaking method for construction engineering risk and its mathematical expression
Keywords: diversion risk engineering insurance insurance premium non-homogeneous compound Poisson process
Situational Awareness in Construction and Facility Management
Burcu Akinci
Frontiers of Engineering Management 2014, Volume 1, Issue 3, Pages 283-289 doi: 10.15302/J-FEM-2014037
Keywords: building information models (BIM) sensors facility operations and management construction management
Web-based construction equipment fleet management system: cost-effective global and local allocation
Hakob AVETISYAN, Miroslaw SKIBNIEWSKI
Frontiers of Engineering Management 2017, Volume 4, Issue 1, Pages 76-83 doi: 10.15302/J-FEM-2017012
Keywords: Construction equipment Equipment assignment optimization Web-based asset management
Value Management Practices on Major Construction Projects and Green Building
Ru-jiang Zhao,Wung Hee Moh
Frontiers of Engineering Management 2016, Volume 3, Issue 2, Pages 147-157 doi: 10.15302/J-FEM-2016018
Keywords: value management (VM) VM theory and practices Chinese construction industry green buildings
Project management maturity in construction consulting services: Case of Expo in China
Yongkui LI, Qing YANG, Yan ZHANG
Frontiers of Engineering Management 2020, Volume 7, Issue 3, Pages 384-395 doi: 10.1007/s42524-019-0070-z
Keywords: construction consulting services project management maturity model non-process factors Expo
Construction management and technology innovation for main projects of Quanzhou Bay Bridge
Jun DU, Fangwen WENG
Frontiers of Engineering Management 2021, Volume 8, Issue 1, Pages 151-155 doi: 10.1007/s42524-020-0147-8
Keywords: construction management technology innovation UHPC trestle panel
Xiaoxiao XU, Patrick X. W. ZOU
Frontiers of Engineering Management 2021, Volume 8, Issue 1, Pages 17-31 doi: 10.1007/s42524-019-0091-7
Keywords: system dynamics construction management problem and recommendation research directions literature review
Dynamic Coordinated Management Model of Programme in Large-Scale Construction Company
Feng Guo,Yi-qi Chen,Yi-qing Cai
Frontiers of Engineering Management 2015, Volume 2, Issue 3, Pages 287-292 doi: 10.15302/J-FEM-2015041
Keywords: large-scale construction company programme dynamic coordinated management model
Research and Practice of Meta-synthesis Management for the Government-led Urban Complex Construction
Ru-gui Chen,Jia-meng Chen
Frontiers of Engineering Management 2014, Volume 1, Issue 1, Pages 52-61 doi: 10.15302/J-FEM-2014008
Keywords: government-led construction project urban complex meta-synthesis management sustainable development benefit
Title Author Date Type Operation
The South-to-North Water Diversion Project
Office of the South-to-North Water Diversion Project Construction Committee, State Council, PRC
Journal Article
A DSS for Management on the Jointly Discharging of Overtopped Cofferdam
Fang Debin,Wang Xianjia,Hu Zhigen
Journal Article
Multi-objective Risk Model of Optimal River Diversion Standards During Initial Stage Construction for
Hu Zhigen,Liu Quan,He Changhal,Xiao Huanxiong,Zhou Yihong,Fu Zheng,Li Dingkui
Journal Article
Whole construction process real-time schedule control and visual analysis of the long distance diversion
Hu Lianxing,Tong Dawei,Jiao Kai
Journal Article
A study of the management model of ecological diversion water in the Dongchang Lake watershed
Chen Youyuan,Cui Xiang,Yang Shiying,Zhang Wei,Li Yaping,Hu Guangxin
Journal Article
The construction design and practice of Three Gorges Project
Wen Yonghong,Xie Xiangrong,Fan Wuyi
Journal Article
Insurance ratemaking method for risk of construction diversion project
Chen Zhiding,Hu Zhigen
Journal Article
Web-based construction equipment fleet management system: cost-effective global and local allocation
Hakob AVETISYAN, Miroslaw SKIBNIEWSKI
Journal Article
Value Management Practices on Major Construction Projects and Green Building
Ru-jiang Zhao,Wung Hee Moh
Journal Article
Project management maturity in construction consulting services: Case of Expo in China
Yongkui LI, Qing YANG, Yan ZHANG
Journal Article
Construction management and technology innovation for main projects of Quanzhou Bay Bridge
Jun DU, Fangwen WENG
Journal Article
System dynamics analytical modeling approach for construction project management research: A critical
Xiaoxiao XU, Patrick X. W. ZOU
Journal Article
Dynamic Coordinated Management Model of Programme in Large-Scale Construction Company
Feng Guo,Yi-qi Chen,Yi-qing Cai
Journal Article